Data Centre Dependency Map
Data Center Project Planner
Pick a planner input to see everything it changes, or click any calculator to trace what it needs and what it feeds.
Data Center Planning & Design
Explore Calculators by Discipline
Ten engineering disciplines, one set of project inputs. Pick a discipline to see its calculators, what is live now and what is coming next.
Electrical Power & Load
IT load, UPS and batteries, generators, transformers, PDUs, cabling and earthing.
- EL.01IT Load & Rack Power Density
- EL.02Facility Power & Grid Connection
- EL.03UPS & Battery Sizing
Mechanical, Cooling & HVAC
Cooling load, chillers, CRAH and CRAC units, airflow, chilled water, pipes and pumps.
- ME.01Cooling Load
- ME.02Chiller & Heat Rejection
- ME.03CRAH / CRAC Sizing
Architecture & Space Planning
Data hall sizing, rack layout, building and site area, floor heights and generator noise.
- AR.01Data Hall Sizing
- AR.03Building Area (GFA) & White-Space Ratio
- AR.04Site Land Area
Structural
Rack and equipment weight, floor and roof loading, foundations and seismic loads.
- ST.01Rack & Equipment Weight
- ST.02Floor Loading
- ST.03Equipment Foundation Load
Fire & Life Safety
Gaseous suppression, fire water, egress, smoke detection, emergency lighting and battery rooms.
- FS.01Gaseous Fire Suppression
- FS.02Fire Water (Sprinkler, Storage & Pump)
- FS.03Egress & Fire Compartment Check
IT & Network
Server and storage capacity, refresh savings, bandwidth, spine-leaf ports and fibre.
- IT.01Server & Rack Capacity
- IT.02Server Count from Workload
- IT.03Server Refresh Savings
AI & High-Density
GPU cluster power, rack density, air/liquid heat split, direct-to-chip and immersion cooling.
- AI.01GPU Cluster Power
- AI.02GPU Rack Density & Cooling Type Selector
- AI.03Air / Liquid Heat Split
Energy & Sustainability
PUE, annual energy cost, carbon, water use, renewables and heat reuse.
- EN.01PUE & DCiE
- EN.02Annual Energy & Electricity Cost
- EN.03PUE Improvement & Energy Savings
Reliability & Operations
Redundancy, availability and downtime, tier comparison, staffing and spare parts.
- RE.01Redundancy Configurator (N, N+1, N+2, 2N, 2N+1, DR)
- RE.04Tier / Resilience Class Comparison
Cost, Finance & Delivery
CAPEX, OPEX, TCO, ROI and payback, colocation pricing and construction programme.
- CO.01Construction Cost & CAPEX
- CO.03OPEX
- CO.05ROI, Payback, NPV & IRR